Project Details

UNIVERSITY OF WISCONSIN- MADISON
MADISON, WI
Completed 2005
320,000 SF New Construction
85,000 SF Remodel

Project Summary

CAMP RANDALL STADIUM RENOVATION

The renovation featured a comprehensive overhaul of the stadium seating bowl, including exiting and circulation systems to improve seating and increase toilet capacities. Internal remodelling focused on expanding and upgrading concourse and concessions areas, as well as increasing on-site food prep and storage capabilities.

Exterior design emphasis was focused on maintaining the main aesthetic characteristics of the existing structure while updating and enhancing its overall public image. All schedules were met and Stadium operations continued throughout construction. In addition to successfully solving the technical construction issues, the design integrated functionally and visually into the Stadium, surrounding Athletics facilities, and urban neighbourhood.

Project Awards:

2005 Wisconsin Division of Facilities Development - Excellence in Engineering Design Award
2006 State of WI Governor’s Special Recognition Award
2006 ACECW Engineering Excellence Best of State Award
2006 COAA Project Leadership Award Honorable Mention

UNIVERSITY OF WISCONSIN- MADISON
MADISON, WI
Completed 2005
320,000 SF New Construction
85,000 SF Remodel

Project Description

The renovation featured a comprehensive overhaul of the stadium seating bowl, including exiting and circulation systems to improve seating and increase toilet capacities. Internal remodelling focused on expanding and upgrading concourse and concessions areas, as well as increasing on-site food prep and storage capabilities.

Exterior design emphasis was focused on maintaining the main aesthetic characteristics of the existing structure while updating and enhancing its overall public image. All schedules were met and Stadium operations continued throughout construction. In addition to successfully solving the technical construction issues, the design integrated functionally and visually into the Stadium, surrounding Athletics facilities, and urban neighbourhood.

Project Awards:

2005 Wisconsin Division of Facilities Development - Excellence in Engineering Design Award
2006 State of WI Governor’s Special Recognition Award
2006 ACECW Engineering Excellence Best of State Award
2006 COAA Project Leadership Award Honorable Mention