
Renovations need to preserve, but they also need to amplify, ignite, and build business opportunity.
field house exterior
rehabilitation
It’s a landmark building in a number of ways. From being listed on the National Register of Historic Places to the record-setting attendances and the momentous wins, the Wisconsin Field House is a memorable place steeped in a rich history. Bringing the Field House back to it’s former architectural glory, the rehabilitation included replacement of original windows, façade cleaning and masonry repair. All work meeting guidelines set forth by the Wisconsin Historical Society.



The Student-Athlete Performance Center was designed to elevate the University of Wisconsin, Madison’s standing as one of the finest intercollegiate athletics programs in the country. The project was complex; a multi-phased, multi-building, renovation-expansion to be integrated with existing facilities, and without disrupting the scheduling of varsity practices or football games



For the last two decades, we’ve found a way to make impossible construction possible, delivering facilities, fields, and renovations.
Opened in 1917 on the site of a former Civil War Union training camp, Camp Randall stadium is now the third-oldest college football stadium in the country. Revered among sports fans who come for the atmosphere as much as the game, Camp Randall holds a special place in the state’s heart. That means renovations aren’t just technically challenging, they can be emotionally fraught.


